Renovation and build cost estimate: what are you actually paying for?

If three builders give you three very different prices, it is usually not the rates that differ — it is what each of them included. With your own itemised material list the quotes become comparable, even without a construction background.

Why it is hard to tell which quote is the good one

The quotes do not cover the same things

One includes the corner beads and fixing plugs for the insulation, another does not. The bottom lines are then not comparable, even though at first glance they look like they are.

“Materials + labour” on a single line tells you nothing

It does not show how many square metres or how many pieces the builder allowed for. If it turns out mid-job that more is needed, the extra is on you.

Asking afterwards is expensive

Once work has started, variations always cost more than the original quote. Quantities are worth settling before the contract.

What your own material list gives you

You will know the order of magnitude

Not the exact pennies, but roughly how much material is involved. That is enough for an unrealistically low or high quote to stand out.

You will have something to compare against

You can go through the quotes line by line against the list, and ask about whatever is missing from them.

In a breakdown you can follow

By material category, in plain language — masonry, insulation, screed, floor and wall finishes, roofing. Not trade jargon.

For the whole house or just part of it

You choose which material categories you care about. For a bathroom refit you do not need the roofing.

How it works, step by step

  1. Find the drawing

    The planning or construction drawing as a PDF. If you do not have it digitally, you can request it from your architect or the building authority.

  2. Upload the floor plan

    The floor plan is required; a section and a site plan make the result more precise. Processing takes 1–3 minutes.

  3. Check the recognised data

    It is worth checking the room names and sizes. If something is off, you can change it — no professional knowledge needed, just the drawing.

  4. Download it and take it with you

    Take the PDF report to your meeting with the builder and go through it item by item together.

See how much material is involved

Upload the PDF of your drawing and get the itemised material list within minutes. Your first report is free after signing up, no card required.